Survey of the works
The Storm Surge Barrier in the Hollandse IJssel (1954-1958)The Zandkreekdam (1957-1960)
The Veerse Gatdam (1958-1961)
The Grevelingendam (1958-1965)
The Volkerakdam (1955-1977)
The Haringvlietdam (1956-1972)
The Brouwersdam (1963-1972)
The Storm Surge Barrier in the Eastern Scheldt (1967-1986)
A number of dams at locks at the far end of the Eastern Scheldt had to manage the water due to the construction of the Eastern Scheldt Storm Surge Barrier: the compartmentalization works. These include:
The Philipsdam (1976-1987)
The Oesterdam (1977-1988)
The Marquisate Quay (1980-1983)
The Bath discharge canal and sluice (1980-1987)
Another barrier mentioned in the Delta Act but which was not implemented by the service Deltadienst is the realization of the Lauwerszee works (1961-1968).
Several other large-scale hydraulic engineering works which were implemented at the same time as the Delta works or which were or are being constructed as a result of them are:
The Scheldt-Rhine link (1967-1976)
The Zeeland bridge (1963-1965)
The Maeslant Storm Surge Barrier (1989-1997)
The Western Scheldt tunnel (Westerscheldetunnel) (1997-2002)